JHA Examples by Trade: Sample Job Hazard Analyses for Common Construction Tasks

A job hazard analysis lists each step of a task, the hazards at each step, and the controls that prevent harm, working from elimination and engineering controls down to PPE. Below are sample JHA tables for seven common construction activities. Use them as starting points: adapt every line to your site, equipment and contract requirements, and pair each JHA with a daily pre-task plan.

Additional official sample JHAs for carpentry, electrical, excavation, plumbing and roofing are published by Brookhaven National Laboratory at https://www.bnl.gov/esh/shsd/seg/cs-pha-index.php.

How to read these tables

Each table has three columns: the step, the hazard (what can cause harm), and the control. Controls are listed in rough order of the hierarchy, strongest first. Every JHA should also list required training, equipment inspections and permits.

1. Wall framing and sheathing

Step Hazard Control
Material handling Strains, pinch points Two-person lifts over 50 lb, staged material near work
Cutting Blade contact, kickback Guarded saws, cut stations, no bypassing guards
Nailing Nail gun discharge Sequential trigger, no carrying with finger on trigger
Wall raising Wall falling, struck-by Plan the lift, enough hands, brace immediately
Sheathing at height Fall from edge or ladder Guardrails or fall arrest above 6 ft, ladder setup check

Training/permits: nail gun training, fall protection training.

2. Electrical rough-in and terminations

Step Hazard Control
Lift or ladder setup Falls, tip-over Lift inspection, tie-off per manufacturer, ladder checks
Conduit install Strains, overhead work Proper lift height, eye protection
Pulling wire Pulling equipment failure Inspect tugger and rope, keep clear of line of pull
Terminations Contact with energized parts Lockout/tagout, verify absence of voltage, qualified person
Temporary power Shock GFCI on all temp cords, cord inspection

Training/permits: LOTO, qualified electrical worker, energized work permit if required.

3. Trenching and excavation

Step Hazard Control
Locate utilities Striking buried lines 811 locate, private locate, pothole near marks
Excavation Cave-in Protective system for trenches 5 ft or deeper per competent person (sloping, shoring or trench box)
Spoils Material falling in Keep spoils at least 2 ft from edge
Access Falls into trench Ladder within 25 ft of workers in trenches 4 ft or deeper, barricades
Equipment Struck-by Spotter, swing radius barricade

Training/permits: competent person on site, daily trench inspection, excavation permit if required.

4. Low-slope roofing

Step Hazard Control
Hoisting material Falling load, struck-by Controlled zone below hoist, tag line
Working near edge Fall from roof Guardrails or warning line plus fall arrest per plan
Skylights and openings Fall through Covers rated and marked, or guardrails
Hot work or torch Fire, burns Hot work permit, fire watch, extinguisher
Weather Heat, wind, slips Heat plan, stop work in high wind, footwear

5. Drywall hanging and finishing

Step Hazard Control
Board handling Strains, board falling Carts, two-person carry, store flat
Ceiling board Overhead strain, falling board Panel lift, secure before screwing
Stilts or baker scaffold Falls Guardrails on scaffolds over 4 ft as required, clean floors
Sanding Dust Vacuum sanders, respirator per assessment
Cutting Knife cuts Cut-resistant gloves, retractable blades

6. Structural steel erection

Step Hazard Control
Rigging and lifts Load drop, struck-by Qualified rigger and signal person, inspect rigging, no one under load
Connecting Falls Fall protection per Subpart R and site plan
Bolting Dropped tools Tool lanyards, controlled zone below
Decking Falls through openings Cover and secure openings, controlled decking zone rules
Weather Wind Stop lifts at crane limits

7. Hot work (welding, cutting, brazing)

Step Hazard Control
Setup Fire from sparks Hot work permit, remove or cover combustibles within 35 ft (common permit rule from NFPA 51B)
Cylinders Cylinder falls, leaks Secure upright, caps on, leak check
Welding Fumes, arc flash, burns Ventilation, welding hood, FR clothing
After work Smoldering fire Fire watch during and after per permit

Tips to get your JHA accepted

  • Make it site-specific: name the building, level and equipment
  • Name hazards, not injuries
  • Do not rely on PPE alone
  • List training and competent persons by name where possible
  • Update it when methods change
  • Review it with the crew before the scope starts

Reviewing a sub's JHA: what general contractors check

When a subcontractor submits a JHA before mobilizing, general contractor safety and project staff typically check:

  • Does it cover every activity in the sub's scope on this project?
  • Are the steps specific to this site and method?
  • Are hazards named clearly?
  • Do controls go beyond PPE where they can?
  • Are competent persons and training listed?
  • Are permits identified?
  • Does it reflect the site safety plan and owner rules?

Build one with the free pre-task plan builder: steps, hazards, controls, PPE, permits and a crew sign-off sheet, printable with no login.

Keep JHAs and daily PTPs in the record

Cascade is SMS-first field intelligence for general contractors and subcontractors: superintendents and foremen text in their day, along with their subs, and Cascade builds the daily report with pre-task plans, toolbox talks and safety items attached. Product scope: Daily reports, manpower and hours by sub, photos, toolbox talks, pre-task plans (JHA), safety incidents and corrective actions, project + schedule planning, automatic sub reminders, analytics and plain-English answers.

Subcontractor access is free. See why Cascade and SMS daily construction reports. Free onboarding and integration, a one-month pilot on the general contractor plan with no contract lock-in, and a price below Raken, Procore and ACC, guaranteed.

Request Access

Frequently asked questions

How detailed should a JHA be?

Detailed enough that a new crew member understands each step, what can hurt them at that step, and what control is in place. Most construction JHAs are one to three pages per activity.

Can I reuse a JHA from another job?

You can start from one, but review it against this site: access, adjacent trades, equipment, weather and owner rules. General contractors often reject JHAs that are clearly copied from another project.

What is the hierarchy of controls in a JHA?

From most to least effective: eliminate the hazard, substitute something less hazardous, engineering controls such as guardrails or ventilation, administrative controls such as permits and training, and PPE last.

Are these examples ready to submit?

No. They are examples to adapt. Your JHA must reflect your methods, equipment, site conditions and the requirements in your contract and safety plan.

Request Access

RESOURCES

See how your team reports by text.

Free onboarding and integration, a one-month pilot and no contract lock-in. Tell us about your jobsites.

EARLY ACCESS FOR PUGET SOUND GCS · SET UP IN DAYS · YOUR DATA STAYS YOURS